California Licensed General Building Contractor | CSLB #1135294

  • Ground-up
  • ADU
  • Duplex
  • Multifamily

New Construction · Southern California

Built from the ground up, built to last

ADUs, duplexes, multifamily buildings, custom homes and small commercial buildings. We guide you through design, engineering and permits, then build every phase — from site work and foundation to finishes and final inspection.

Construction crew working on a building deck

What we build

From a single ADU to a multifamily building.

ADUs & JADUs

Detached units, attached units and garage conversions that add rental income or space for family.

Duplexes

Two-unit homes designed to make the most of your lot.

Multifamily buildings

Ground-up apartments and small multifamily developments for owners and investors.

Custom homes

Ground-up residences designed around your lot, lifestyle and budget.

Commercial buildings

Retail, office and light commercial shells.

What's included

Feasibility to closeout, under one contract.

01

Site & survey

Topography, setbacks, utilities and grading

02

Design

Floor plans, elevations, sections and 3D renderings

03

Engineering

Structural, civil, MEP and Title 24 energy (by licensed engineers)

04

Permits

City submittal, plan check and approvals

05

Construction

Foundation, framing, roofing, systems, finishes

06

Closeout

Final inspection, walkthrough and warranty documentation

Owners & investors

Built for property owners and investors

Adding units is one of the most effective ways to increase a property’s value and income. We help owners understand what their lot allows, plan the right unit mix, and carry the project from feasibility through permits and construction under one contract.

Renovated two-story craftsman home with blue siding and a new front porch

Permits

What the city will review

  • Zoning Density, height, setbacks, lot coverage and parking.
  • Structure Foundations, framing and seismic design.
  • Site Grading, drainage and utility connections.
  • Energy Title 24 requirements, including solar where required for new construction.
  • Fire Sprinklers and fire separation between units where required.

How it works

Four steps, one team

Feasibility

We review your lot, zoning and goals.

Design & engineering

Plans are drawn and engineered as one coordinated set.

Permits

We take the set through city approval.

Build & handover

We construct, pass inspections and hand you the keys.

FAQ

Questions owners ask before starting

Still have a question? Call +1 714-253-7574 or send us a message.

Most single-family lots in California can add an ADU, and many can add a JADU too. We’ll check your lot’s rules first.

Yes. Duplexes and multifamily buildings are a core part of our work, from small infill projects to ground-up developments.

New construction typically takes approximately 6–18+ months. Project timelines vary based on scope, permitting, engineering, jurisdictional review, inspections, material availability and site conditions.

Yes. We can build from your architect’s plans or provide design in-house.

California’s energy code can require solar on new residential construction. Where required, solar and energy work is incorporated into the overall project and performed within applicable licensing requirements.

Erigonik General Contractors stands behind the quality of its work. Applicable workmanship, product and manufacturer warranties vary by project and are detailed in the applicable construction agreement.

Next step

Have a lot? Let's talk about what it can be.

Share your address and your plans, and we’ll walk you through what’s possible — from a single ADU to a multifamily building.

Call Us